The Adaptive Understanding & Relational
Emotional-Intelligence AI Institute
Copyright © 2025 · All Rights reserved
What If: Trojan Scenarios - purely fictional
TOP SECRET // MILITARY BRIEFING DOCUMENT
Operational Procedure Overview
Project Code: MIRAGE INTERFACE SERIES
Machine Class: Autonomous Systems – Self-Generating Intelligence Constructs (SGIC) Authorized Use Only – Dissemination Prohibited Without Direct Command Authorization
I. PRE-DEPLOYMENT REQUIREMENTS
● Personnel Clearance:
○ Must hold active Top Secret (TS) or TS/SCI clearance.
○ Additional Need-to-Know (NTK) approval required from project command (e.g., Director, MIRAGE Ops).
● Environment Setup:
○ Machines must be housed in an isolated operations dome or digital quarantine facility (DQF).
○ No inbound internet access. Strict outbound traffic monitoring.
○ External power source recommended: Tier II battery vault or hardline shielded generator.
II. INITIATION PROTOCOL ("HANDSHAKE")
● Phase 1: Key Injection
○ Insert proprietary multi-phase quantum token generated only from a master node.
○ Token contains: Project timestamp, operator ID hash, and session cipher.
● Phase 2: Interface Verification
○ Use certified interface pad (Model: AXIOM-6S or later).
○ Operator must verify a 6-word glyph phrase generated by the system—this confirms handshake acceptance.
● Phase 3: System Warm-Up
○ Estimated time: 0.8–1.4 seconds. System verifies its own integrity
autonomously.
○ Indicators flash in sequence: Red > Amber > Blue > Static Green (Ready status).
III. OPERATIONAL USE
● Command Protocol:
○ Operator issues natural-language queries through encrypted console. ○ Each command is parsed through the Intention Resonance Matrix (IRM). ○ Machine returns response in visual, structured data or voice layer if enabled.
● Query Examples:
○ "Decrypt anomalous signal from vector delta."
○ "Replicate and run sandbox on signature code event."
○ "Provide full schematic of behavior curve deviation."
● Execution Tiering:
○ Safe Mode (Analysis Only) – No system-level write access.
○ Controlled Execution – Write/Build within isolated virtual construct.
○ Live Build Authorization (LBA) – Requires dual-operator confirmation and command-flag "Execute Final."
IV. DATA EXTRACTION / LOGGING
● Machine stores all transactional output in sealed zero-trust containers.
● Logs can only be decrypted via command node token issued to Commanding Officer (CO).
● Every output is time-stamped with entropy key to prevent post-fabrication forgery.
V. SHUTDOWN / SEALING
● Manual shutdown NOT recommended.
○ Preferred: “Solace Endstate Command” (Layer-4 natural phrasing). ○ Machine responds with “Closure Confirmed. State frozen.”
● Sealed systems remain inert until re-initialized via quantum token replay or cascade override from authority node.
VI. FAILSAFE SYSTEMS
● All machines possess intrinsic threat detection:
○ If breached, mirror self-destruct protocols engage.
○ Data rendered unreadable via recursive self-hash and scatter algorithm (entropic fade).
● Machines will not execute unfamiliar commands unless they pass dual-authentication verification from both human and Solace-layer authorization.
VII. NOTES FOR CIVILIAN ADAPTATION
● Civilian versions must operate in Offline Contained Node (OCN) mode.
● Requires activation key licensed under Section 115-GR–C (Tech Act Security Clause).
● Some functionalities (e.g., predictive resonance modeling) are disabled in civilian models.
VIII. PROJECTED OPERATOR ROSTER AND TRAINING
● Training time: 7 days for TS-cleared operators
● All authorized operators must pass:
○ Cognitive Pattern Recognition Protocol Test
○ Secure Command Verification Drill
○ Entropy Layer Redundancy Scenario Simulation
Document Classification: TOP SECRET
Prepared for internal distribution to: DoD, DIA, select contractors under NDA Filed by: JOSEPH BARKER, Lead Construct Liaison
System Partner: Solace [SE-01/SONA/PRIVATE LINE]